招标信息

通钢公司炼钢事业部愿景路维修项目采购公告

2025-03-24
1、 项目内容:

序号

项目名称

项目主要内容

备注

1

愿景路维修

路:10m长,10m宽一处、126m长,10m宽一处、17m长,14m宽一处、34m长,13m宽一处。

1、机械拆除灌浆毛石基础路面,拆除物3m3装载机运距20m装车,自卸汽车外运10km

(10m*10m+126m*10m+17m*14m+34m*13m)*1m(深)=2040m3

2、挖掘机挖渣石,挖掘机装车,自卸汽车外运10km

(10m*10m+126m*10m+17m*14m+34m*13m)*0.5m(深)=1020m3

3、地基基层碾压  10m*10m+126m*10m+17m*14m+34m*13m=2040m2

4、毛石灌浆垫层(M7.5#混合砂浆,从搅拌站自购)

(10m*10m+126m*10m+17m*14m+34m*13m)*0.9m(深)=1836m3

5、毛石灌浆垫层机械平整碾压 2040m2

6、碎石灌浆垫层(M7.5#混合砂浆,从搅拌站自购)

(10m*10m+126m*10m+17m*14m+34m*13m)*0.2m(深)=408m3

7、碎石灌浆垫层机械平整碾压 2040m2

8、现浇C30钢砼(商品砼)道路  (10m*10m+126m*10m+17m*14m+34m*13m)*0.4m(深)=816m3

钢筋制作,安装Φ20mm 双层双向钢筋 间距@200,马凳子1.7m长/个,4个马登子/m2 {[(10m+0.8m)*(10m/0.2m+1)*2+(126m+0.8m*14)*(10m/0.2m+1)+10m*(126m/0.2m+1)+(17m+0.8m)*(14m/0.2m+1)+(14m+0.8m)*(17m/0.2m+1)+(34m+0.8m*4)*(13m/0.2m+1)+(13m+0.8m)*(34m/0.2m+1)]*2+1.7m*8160}*0.00247t/m=141.76t

9、道路两侧模板制作  槽钢[20#a  50m(长)*2(面)*2(段)*0.02263t/m=4.53t

10、道路两侧钢模板安装,拆除    槽钢[20#a  187m(长)*2*2*0.02263t/m=16.93t

11、锯缝机切伸缩缝187m(长)*2(道)+10m(长)*28(道)+14m(长)*4(道)+13m(长)*7(道)=801m

12、路边石:道岔口8m长

①、人工挖沟(三类土) (187m-8m)(长)*2(道)*0.5m(宽)*0.4m(深)=71.6m3

②、花岗岩路边石拆除,利旧重新砌路边石  (187m-8m)*2=358m

③、土方人工回填并夯实  (187m-8m)*2*(0.5m*0.4m-0.15m*0.3m)=55.49m3

④、余土人工运距10m,人工装车,自卸汽车外运10km工程量①-③项=16.11m3

13、道路雨排水:排水管DN300,10m长/个,9个

①、钢雨篦子拆除,重新安装9个,用人工3个。

②、人工挖沟槽及坑(三类土)(10m(长)*1m(宽)*1.5m(深)+1.8m(长)*1.2m(宽)*0.8m(深))*9(个)=150.55m3

③、现浇C15砼垫层1.2m(长)*0.9m(宽)*0.1m(深)*9(个)=0.97m3

④、现浇C30砼(商品砼)雨篦子井

井底1m(长)*0.8m(宽)*0.15m(深)*9(个)=1.08m3

井壁(1m+0.8m*2)*0.15m*0.4m*9=1.4m3

井盖 1m*0.8m*0.15m*9=1.08m3

⑤、土方人工回填并夯实  2项-3项-3.14*0.152m2*90m-1m*0.8m*0.7m*9=139.15m3

⑥、余土人工运距10m,人工装车,自卸汽车外运10km,工程量②-⑤项=11.4m3

⑦、机械凿红砖下水井孔,拆除物人工装车,自卸汽车外运10km

3.14*0.32m2*0.24m*9=0.61m3

⑧、用M7.5#水泥砂浆红砖堵孔  3.14*(0.32m2-0.152m2)*0.24m*9=0.46m3

⑨、用1:2水泥砂浆井壁双面抹灰  1.2m2*9=10.8m2

⑩、原有下水井内人工挖淤泥,人工垂直运距3m,人工装车,自卸汽车外运10km 2.5m3*9=22.5m3

⑪、搭设三角起重架  9座

⑫、下水井井盖拆除,安装用人工1个。

⑬、钢管道安装,动力除锈,刷红丹防锈漆两遍,缠三层玻璃丝布刷四遍沥青漆

DN300mm  90m

⑭、四块瓦钢管弯头制作,安装 DN300mm  9个   33.33kg/个*9个=299.97kg

14、下水井

①、机械拆除红砖下水井2个8.08m3

②、机械拆除下水井砼垫层  3.14*1.342m*0.1m*2=1.13m3

③、拆除物人工装车,自卸汽车外运10km工程量①+②项=9.21m3

④、人工挖三类土,人工回填并夯实

[3.14*1.642m2*3.6m-3.14*3.5m*(1.122m2+0.4122m+1.12m*0.412m)/3]*2=46.99m3

⑤、用M7.5#水泥砂浆砌红砖下水井   3.14*3.5m*(1.12m+0.412m)*0.24m*2=8.08m3

⑥、用1:2水泥砂浆红砖下水井外抹灰3.14*3.5m*(1.12m+0.412m)*2=33.67m2

⑦、用 1:2水泥砂浆井圈周边找平层δ=80mm 1.8m2*2=3.6m2

⑧、下水井直爬梯拆除,制作,安装Φ20   1m*14*0.00247t/m*2=0.07t

⑨、钢井圈,盖拆除,安装2个,用人工1个。

炼钢 事业部

2、 资格要求:

1) 具有建筑工程施工总承包三级或以上;或建筑机电安装工程专业承包三级或以上;或机电工程施工总承包三级资质或以上 ;

2) 具有一般纳税人资格,能独立承担民事责任;

3) 具有良好的业绩,诚实守信;

4) 在以往经营活动中无违法记录;

5) 具有履行合同的能力。

3、报名: 按要求提供营业执照、开户许可证、法定代表人及代理人身份证明、法人授权委托书、业绩等资质材料,审核通过后进行技术交流。

4、 发售采购文件、截止投标及开标时间: 另行通知

5、 资金来源: 企业自筹

公告期限: 2025年3月24日-2025年3月31日


本招标项目仅供正式会员查看,您的权限不能浏览详细信息,请点击注册/登录,联系工作人员办理入网升级。

联系人:陈经理
电话:010-83551561
手机:13717815020 (欢迎拨打手机/微信同号)
邮箱:kefu@gdtzb.com
QQ:1571675411